In short
Tooling covers mould design, manufacture, trial shots and sample approval. The tool is matched to the parameters of the designated casting cell, and approval means the trial parts have been measured against the drawing - not that the mould looks complete.
Matched to a designated machine
A mould is designed for a specific part and matched to the parameters of the designated casting cell: platen size, tie-bar spacing and shot capacity. If the part is later moved to another machine, the match is re-checked before the tool runs there - a tool is not assumed to transfer.
The trial shot
The first shots test fill, detail and dimensions at the same time. Trial parts are measured against the drawing and the critical features agreed at review. The result is a sample and a dimensional report for sign-off, not a verbal opinion that the part looks good.
What approval means
Approval releases the tool for production. It fixes the sample the run is judged against and the process settings that produced it. Changes after approval are still possible, but they are changes to a tool that already exists.
Questions this note raises
How many trial rounds will it take?
There is no fixed number. It depends on the part, the tool and what the measurements show; the aim is a sample that matches the drawing, not a set number of attempts.
Who owns the mould?
The mould is quoted and invoiced with the project. Ownership, maintenance and transfer follow what the quotation and the contract for the project set out.
Can the tool run on another machine?
Only after a re-check. Another machine may not match the platen size, tie-bar spacing or shot capacity, so the fit is reviewed as a new tooling question before the tool is scheduled there.