From drawing to shipment, the records you need are agreed up front.

Before quoting, we review the drawing with you and agree the points to inspect. Trial and production runs follow the confirmed requirements, and each order ships with the inspection documents agreed in the order.

What you receive

The document list is confirmed per project before tooling starts.

Key dimension list

The dimensions and appearance points are confirmed before tooling starts.

First-article report

Trial parts are inspected against the agreed key characteristics, and production starts after your confirmation.

Documents with your order

Material certificate and dimensional record are common; the exact list is confirmed at quotation and shipped as agreed.

From enquiry to shipment

Four steps. The document each step produces is confirmed in the quotation.

01 / 04

Confirm requirements

We review the drawing and list the critical dimensions and appearance points.

You receive The key characteristics list, before quotation.

02 / 04

First-article approval

Trial parts are measured against the agreed characteristic list.

You receive The first-article report; production continues after your approval.

03 / 04

Batch process control

Critical dimensions are checked at the agreed frequency, and trends are corrected early.

You receive In-process inspection records, as agreed in the order.

04 / 04

Shipment

Final inspection is completed and the batch number is checked against the records.

You receive The inspection record, and the material certificate as agreed in the order.

If a part is out of tolerance

The same three steps apply to every non-conformance, whichever stage it is found in.

01

Segregate

Affected parts are segregated and the operation stops as soon as the deviation is found.

02

Written notice

The deviation is reported to you in writing with its scope and the first response; the notification window is agreed in the quality protocol.

03

Corrective action

A corrective-action report follows once the cause is confirmed, including how recurrence is prevented.

Your certification and inspection requirements

An operator standing beside a die-casting machine
Die-casting machine
A worker at a machining centre in the CNC machine line
CNC operation
Workers handling castings one by one at long benches, with blue crates of parts beside them
Finishing
Certification requirements
  • Name the standard your project needs — ISO 9001, IATF 16949 or a customer-specific one — in the request for quotation.
  • We confirm at quotation which documents can be supplied, together with issuer, scope and validity date.
Inspection requirements
  • Mark the tests your part needs — dimensional, material, hardness or others — on the drawing or in the enquiry.
  • The inspection scope and equipment for your part are confirmed at process review and stated with the quotation.
Include inspection requirements with your enquiry

Mark critical dimensions and specify required standards and report formats so we can review the inspection plan.

Questions buyers ask

Common questions from buyers before quoting.

How long does a quotation take?

We reply with the quotation and inspection plan within 1–2 working days after reviewing a complete drawing and quantity. If the drawing is incomplete, we list what is missing first.

Tooling is quoted separately, by tool type and number of cavities. Whether tooling cost can be amortised into the unit price is assessed at quotation from the part and quantity, and set in the order.

Yes. Trial parts follow the first-article process and the report is sent with the samples. The trial lead time for your part is confirmed at quotation.

We list what is missing and ask you to complete it before quoting.

Critical dimensions are monitored at the agreed frequency during the run, and trends are corrected early. Batch comparison data is available on request.

The non-conformance process agreed by both parties applies: segregation, sorting, rework or replacement. The terms are set in the quality agreement.

Tolerance is set per characteristic. As-cast and machined features hold different limits, so the values for your part are given at process review.

The document types agreed for your project may include first-article and dimensional records. If you need material certificates, PPAP or customer formats, state them in the enquiry and we confirm what can be supplied.

Yes. On-site and video audits are welcome; please confirm the scope before the visit.

The lead time is given at quotation. If it changes during production, you are told in advance with a revised plan.

Orders are scheduled by priority and agreed delivery date. If capacity runs short, we say so early and agree a split delivery or a revised plan.

The quotation states the material price and the benchmark it is based on. Larger movements are adjusted under the terms agreed in the order.

Every change is confirmed in writing. The first-article check is repeated and affected batches are notified.

Drawings are used for quotation and production only. If your project requires an NDA or a confidentiality clause, tell us at the enquiry and the arrangement is confirmed before the drawing review.

Send the drawing, get the inspection plan.

Send the drawing with the critical characteristics marked, and state the reports and delivery date you need. We review the inspection plan and document list accordingly.