Die Casting Tooling
Tooling for our own die casting cells: drawing and DFM review, mould design, manufacture, trial shots and sample approval. A tool is matched to the parameters of its designated machine, so the tooling question and the casting question are answered together. A tool is the first real test of the design, and we treat it that way.
Service scope
Draft, parting line and ejection points are checked before the design is fixed.
- Drawing and DFM reviewDraft angles, parting line, wall sections, ribs and ejection points are reviewed before the mould design is fixed.
- Mould designGate, runner and cooling layout matched to the part and the machine it will run in.
- Trial and approvalTrial shots are measured, reviewed with the customer, and only then released to production.
Representative parts
Tools built for our own casting cells. The photographs show parts made on them; a tool can be quoted with a casting route, or as a tooling-only project.
Capabilities
What the tooling route covers, from the DFM review to the tool released to the cell that will run it.
- Mould design and build Design and manufacture in-house for our own casting cells.
- Matched to a designated machine Mould design follows the parameters of the designated machine; another machine is re-checked before the tool runs there.
- DFM before design Draft, parting line, wall sections, ribs and ejection points reviewed before the design is fixed.
- Input format STEP or IGES preferred; a 2D drawing is still needed for critical dimensions and tolerances.
- Trial shots and approval Trial parts measured and reviewed with you before the tool is released to production.
- Production handover The released tool goes to the production cell with the approved settings.
Production route
One project from DFM to handover: design, fabrication, trial shots and sample approval, in that order.
Inspection
A tool is approved on the parts it produces, so the checks run on trial shots and on the sample sent for sign-off.
- DFM reviewDraft, parting line, wall sections, ribs and ejection points are checked against the casting process before the mould design is fixed.
- Tool fabricationMachining, fitting and assembly are checked against the mould design before the first shot.
- Trial shotsFirst parts are cast and measured; fill, detail and dimensions decide what changes before approval.
- Sample approvalSamples and a dimensional report go to the customer for sign-off before the tool is handed over.
Trial shots run on the cell planned for production, so the tool is approved on the machine and settings that will make the part.
Questions engineers ask
Can I order a tool without the production parts?
Yes. A tool can be quoted on its own: mould design, fabrication, trial parts and the dimensional report are priced together, and the casting price follows when you are ready to run production.
Who owns the tool?
The mould is quoted and invoiced as part of the project, and ownership, maintenance and transfer terms are set out in the quotation. Maintenance for the production life of the mould stays with us.
What happens if the tool needs a change after approval?
Changes after approval are quoted as a revision. The DFM review fixes the baseline, so a later change is priced by the work it adds — insert replacement, re-machining or a fresh trial — together with the time it costs.
How long does a tool take?
It depends on part size, cavity count and how much change the DFM review produces. The tooling schedule is quoted with the project and confirmed when the design is released, so the date you plan production against is a committed one.
Have a drawing for this route?
Include the material, quantity and the features that matter. If the drawing is confidential, ask for the NDA step before sending it.